(Links to Strategy 3: Technical Development and Innovation)
Sponsor: Keith Davidson
Staff Support: Richard St Clair
Status: Active
Description: Rebuilding, and upgrading of the existing networks that support the INZ and DNC offices.
Budget: N/A
Overall Progress Summary: A work in progress.
Activities Planned for May 2009:
General Maintenance.
History:
April 2009
- VoIP Evaluation
- Bring Auckland Networks online
- Continue ipv6 as needed
March 2009
- Bring ipv6 online
- Service and maintenance
February 2009
January 2009
- Ugrade Router for ipv6
- Upgrade Wifi Access Points
- Test Network Wall Outlets
December 2008:
- Replaced Cisco Router in prep for IPv6 (and because the old one was dying anyway)
- VoIP network online
- ALL Internal subnets locked down
November 2008:
- New Samba Servers Online
- Separate Samba DNC from INZ
- Moved old Servers to Auckland for Off Site backups
October 2008:
- Syslog Server Online
- New Samba Servers built and tested
- Reception Moved Upstairs
- Cross Syslog Planned
- Network prepared for Reception Move to Upstairs
- Upstairs Printer added for Meeting Printing
September 2008:
- New Firewall. Running on BSD. Also firewall now running on commercial server.
- Plone server (INZ Website) moved to commercial server on INZ address space.
- Attempt to upgrade router memory to handle ipv6. It can't handle it. Moving on to see about replacing router.
- Support for Online Debate.
- Ongoing maintenance and documentation as usual.
August 2008:
- Replaced OS's in all wifi access points with open source secure OS
- added redundant wifi access points for both level 9 and level 10
- Vmware server added to server farm
- Hard drives installed in several servers to provide RAID and increased storage
- Increased memory on several servers
- SSL certificates renewed for two years
- New Mail Server put online in INZ global address space (no more nat)
- streamlined network access and cabling for level 10 rack
- Cabling improvements to main server rack in machine room.
- Ongoing maintenance and documentation.
July 2008:
- Wiki Site Created for online Documentation and support
- Prepare for mail server migration
- Mail Server and Samba server to be separated into different servers
- Servers to be upgraded to Dell standard (hot swap power supplies and PERC)
- APTLD server moved to INZ address space on commercial server ( no more nat and better box)
- Network Map rebuilt and uploaded to Wiki Site (maintained on change)
- Increased security for all servers with new firewalls on each global address space server
- SSH access box added to server farm
- INZ address space delegated and activated through APNIC
- LIST servers migrated to commercial server
- NZNOG (INZ sponsored server) built and put online
- SMOOTHWALL firewall upgraded (to probably be changed to something running on BSD later)
- NAGIOS watchdog servers put in place with partner servers in the US for added alert efficiency.
June 2008:
- Assess network situation for coming upgrades and changes
- cabling labeled
- cabling cleaned up
- power sources improved
- Giant commercial generator UPS installed with event emailing capabilities.
- Server room re wired to insure operational compliance with rooftop diesel generator
- high current mains outlets added to server room to prepare for UPS
- clone computers now running as servers for APTLD, and other mission critical systems assessed (and will be upgraded to commercial servers).
- Smokeping installed for network monitoring
- MUNIN installed for network monitoring.